RAB WFRL6R139FA120WBS 6" Round Baffle Wafer Downlight 13W Selectable CCT White
Out of stock
About this item
About this item
- 6 in Round Edge-Lit Slim Profile — White Baffle: Metal + plastic construction; recessed mount with no housing required
- Up to 1,148 lm at 88 lm/W: 13W, 110° beam angle; 75W incandescent equivalent
- Field-Selectable CCT: Dipswitch-adjustable 2700K–5000K — 5 color temperatures in 1 SKU; 90 CRI, R9 > 50
- IC Rated, Airtight & Plenum Rated: ASTM E283; FT5 plenum cable (UL2043); TRIAC/ELV dimmable to 10% at 120V
- ENERGY STAR, Title 24 JA8 & Title 20: Wet location rated; NEC closet compliant; 5-year no-compromise warranty
Description
Description
RAB WFRL6R139FA120WBS 6 in Round Baffle Edge-Lit Wafer Downlight — 13W / Selectable CCT / 120V / White
The RAB WFRL6R139FA120WBS is a 6 in round edge-lit wafer downlight in white finish with a baffle trim, delivering up to 1,148 lumens at 13W with a 110° beam angle and 90 CRI. No recessed housing required. CCT is field-selectable 2700K–5000K via dipswitch with TRIAC/ELV dimming at 120V.
Key Features
- 6 in Round Edge-Lit Slim Profile — White Baffle: Metal + plastic construction; recessed direct mount, no housing required
- No Housing Required: Integral mounting for direct mounting to building structure or mounting frame
- Field-Selectable CCT: Dip-switch adjustable between 2700K, 3000K, 3500K, 4000K, and 5000K; 5 CCTs in 1 SKU
- Lumen Output: 1,148 lm (4000K); 1,139 lm (5000K); 1,117 lm (3500K); 1,046 lm (3000K); 1,008 lm (2700K)
- Per-CCT Efficacy: 88 lm/W (4000K/5000K); 86 lm/W (3500K); 80 lm/W (3000K); 78 lm/W (2700K)
- Wattage: 13W | 75W incandescent equivalent
- CRI & Beam: >90 CRI, R9 > 50 | 110° (±10°) beam angle
- Dimming: TRIAC/ELV dimmable to 10% at 120V
- Voltage: 120V
- IC Rated: Type IC inherently protected; cULus listed for damp locations; not for spray foam (NEMA LSD57-2013); ASTM E283 certified
- Plenum Rated: FT5 plenum rated cable per UL2043
- Certifications: UL Listed, ENERGY STAR, Title 24 JA8, Title 20, RoHS, FCC Part 15 | NEC closet compliant Sec. 410.16 (A)(1) & (C3)
- Lifespan: 50,000 hours L70 per IES LM-70
- Warranty: 5-year no-compromise warranty
Construction & Design
Metal and plastic body with baffle white trim and frosted polycarbonate light diffuser for even, smooth illumination. IC rated (Type IC inherently protected) and airtight (ASTM E283); not for spray foam (NEMA LSD57-2013). Plenum rated cable per UL2043.
Light Output & Performance
Up to 1,148 lm at 88 lm/W (4000K), 110° beam angle, >90 CRI, R9 > 50. Field-selectable CCT (2700K–5000K). CCT shift warranted ≤200K over 5 years; <4-step MacAdam Ellipse consistency (2700K & 5000K). 50,000 hrs L70 per IES LM-70.
Electrical & Installation
120V Constant Current Class 2 driver (130mA). TRIAC/ELV dimmable to 10%. FT5 plenum rated cable (UL2043). Recessed direct mount — no housing required; integral mounting to building structure or mounting frame. THD ≤20%, PF ≥0.9. Operating temp: -4°F to 104°F (-20°C to 40°C).
Compatible Accessories (sold separately)
- WFRL-GOOF-6R-8R-W — 6 in–8 in goof ring, round, white
- WFRL-TRIM-6R-BS — 6 in color trim round smooth, black
- WFRL-TRIM-6R-BRS — 6 in color trim round smooth, bronze
- WFRL-TRIM-6R-BNS — 6 in color trim round smooth, brushed nickel
- DLPLATE/WFR3468/NB — Mounting plate with nailer bar (3, 4, 6, 8 in)
- DLPLATE/WFR3456 — Mounting plate for 3, 4, 5, 6 in
- EXTCBL-FA-6 — 6 ft extension cable
- EXTCBL-FA-12 — 12 ft extension cable
- EXTCBL-FA-20 — 20 ft extension cable
- DRI-25-EMGR-DC — Emergency driver 100-277V 25W
- DRI-21-EMGR-DC-D10 — Emergency driver 100-277V 21W 0-10V T20
What’s Included
- RAB WFRL6R139FA120WBS 6 in round baffle edge-lit wafer downlight (white)
- Die-formed metal driver/junction box
Specifications
Specifications
Dimensions
Style & Materials
Characteristics & Features
Electrical Information
Item Details
Warranty & Certifications
Shipping & Returns
Shipping: Enjoy free standard shipping on most orders over $99. Exclusions apply for oversized & commercial items. We ship to the contiguous 48 United States.
Returns: We offer a 60-day return window for most items. Products must be in their original, unused condition with all packaging. Exclusions: Special orders, clearance, and custom items.
Frequently Asked Questions
Is the RAB WFRL6R139FA120WBS rated for wet locations?
Is the RAB WFRL6R139FA120WBS rated for wet locations?
What is the beam angle of the RAB WFRL6R139FA120WBS?
What is the beam angle of the RAB WFRL6R139FA120WBS?
Is the RAB WFRL6R139FA120WBS dimmable?
Is the RAB WFRL6R139FA120WBS dimmable?
What is the lumen output of the RAB WFRL6R139FA120WBS across CCTs?
What is the lumen output of the RAB WFRL6R139FA120WBS across CCTs?
Can the RAB WFRL6R139FA120WBS be installed in a closet?
Can the RAB WFRL6R139FA120WBS be installed in a closet?

