4" Wafer LED Downlight, 750 Lm, 5-CCT, White Shallow Baffle Trim
4" Wafer LED Downlight, 750 Lm, 5-CCT, White Shallow Baffle Trim
Super Slim Edge-Lit Design | No Housing Required | IC & Airtight Rated
Out of stock
Highlights
Highlights
- Ultra-Slim Wafer Design: Installs in tight spaces where traditional recessed lights won't fit
- Bright Illumination: 750 lumens of powerful light for superior visibility
- Selectable Color Temperature: Choose from 5 color temperatures (2700K/3000K/3500K/4000K/5000K) for ultimate flexibility
- White Shallow Baffle Trim: Low-profile baffle design reduces glare while maintaining minimal depth
- Dimmable Performance: Adjustable brightness control for flexible lighting management
Shipping & Returns
Shipping & Returns
Shipping: Enjoy free standard shipping on most orders over $99. (Exclusions apply for oversized & commercial items). We ship to the contiguous 48 United States.
Returns: We offer a 60-day return window for most items. Products must be in their original, unused condition with all packaging. (Exclusions: Special orders, clearance, and custom items).
We process payments securely and do not store credit card information.
Overview
Overview
Wafer LED Downlight with Shallow Baffle Trim
Discover the RAB Lighting WFRL4R99FA120WBS, a 4-inch wafer LED downlight delivering 750 lumens with complete color temperature flexibility. This fixture features white shallow baffle trim for glare control with a low-profile design.
Key Benefits
- 5 Selectable Color Temperatures: Choose between 2700K, 3000K, 3500K, 4000K, or 5000K
- Bright Illumination: 750 lumens provides efficient, reliable lighting
- White Shallow Baffle Trim: Low-profile design with glare control for enhanced visual comfort
- Universal Dimming: Dimmable down to 10% on compatible TRIAC/ELV dimming systems
- Ultra-Thin Wafer Design: Sleek profile integrates seamlessly into ceilings
- Energy Efficient: LED technology minimizes energy consumption while maximizing performance
- Long-Lasting Performance: Extended lifetime reduces maintenance and replacement costs
Perfect For
Residential and commercial spaces, living areas, kitchens, offices, and any application requiring efficient recessed lighting with low-profile glare control.
Professional-grade quality backed by RAB Lighting's trusted reputation.
- Ultra-Slim Wafer Design: Installs in tight spaces where traditional recessed lights won't fit
- Bright Illumination: 750 lumens of powerful light for superior visibility
- Selectable Color Temperature: Choose from 5 color temperatures (2700K/3000K/3500K/4000K/5000K) for ultimate flexibility
- White Shallow Baffle Trim: Low-profile baffle design reduces glare while maintaining minimal depth
- Dimmable Performance: Adjustable brightness control for flexible lighting management
Technical Resources
Specifications
Recently Viewed Products
Frequently Asked Questions
Do you offer free shipping?
Do you offer free shipping?
Yes, we provide free shipping on orders over $99 delivered within the lower 48 states. However, this excludes items that are 48" or longer and commercial lighting fixtures.
For more information, refer to our shipping policy.
What is your return policy?
What is your return policy?
If you're not happy with your purchase, you can return or exchange it within 60 days after it's delivered. To be eligible for a return, please ensure the item is in its original condition (just as you received it), including all packaging, manuals, and accessories. You'll also need your receipt or proof of purchase.
While original shipping fees aren't refundable, we will cover the return shipping costs if the return is necessary because of our mistake (like sending the wrong item) or a product defect. Otherwise, the customer is responsible for return shipping expenses. Keep in mind that restocking fees might be applied if the returned item doesn't meet the required conditions.
For more information, refer to our return policy.
Are there any restrictions on coupon codes?
Are there any restrictions on coupon codes?
Yes, some restrictions apply. Our promotional coupon codes are valid for thousands of regular priced items across our store.
However, coupon codes are generally not applicable to the following:
- Items that are already on sale, on clearance, or otherwise advertised with a discounted price.
- Products from the following brands: Fanimation, George Kovacs, Metropolitan Lighting, Minka Aire, Minka-Lavery, and The Great Outdoors.
Any applicable discount will be automatically calculated on all eligible items in your cart during checkout.
Do your products come with a warranty?
Do your products come with a warranty?
Yes, all products sold by Bees Lighting are brand new and covered by the manufacturer's warranty. The warranty period and terms vary by manufacturer and product.
Do you offer special pricing for lighting professionals?
Do you offer special pricing for lighting professionals?
Yes, we do! Our Bees Lighting Pro program is our B2B Trade Program designed specifically for interior designers, architects, builders, contractors, electricians, and other industry professionals. Members receive access to exclusive pricing and dedicated support to help streamline their projects.
To learn more and apply, please visit our Bees Lighting Pro page.

